To bring its net-zero-energy goal within reach in cloudy Seattle, the Bullitt Center has a 242-kW photovolatic array covering 14,000 square feet. It extends as much as 20 feet from the edges of the roof.
First Look: Miller Hull's Bullitt Center
![To bring its net-zero-energy goal within reach in cloudy Seattle, the Bullitt Center has a 242-kW photovolatic array covering 14,000 square feet. It extends as much as 20 feet from the edges of the ro](https://www.architecturalrecord.com/ext/resources/archives/news/2013/04/images/slideshow/130422/1.jpg?t=1450318324&width=1080)
First Look: Miller Hull's Bullitt Center
To bring its net-zero-energy goal within reach in cloudy Seattle, the Bullitt Center has a 242-kW photovolatic array covering 14,000 square feet. It extends as much as 20 feet from the edges of the roof.
Photo © Benjamin Benschneider
![With the goal of making the stairs a more attractive option than the elevator, the design team created an “irresistible stair” with wood treads and glass balustrades.](https://www.architecturalrecord.com/ext/resources/archives/news/2013/04/images/slideshow/130422/2.jpg?height=720&t=1450318324)
First Look: Miller Hull's Bullitt Center
With the goal of making the stairs a more attractive option than the elevator, the design team created an “irresistible stair” with wood treads and glass balustrades.
Photo © Benjamin Benschneider
![The stair projects from the facade and offers views of downtown’s skyline from the landings.](https://www.architecturalrecord.com/ext/resources/archives/news/2013/04/images/slideshow/130422/3.jpg?height=720&t=1450318324)
First Look: Miller Hull's Bullitt Center
The stair projects from the facade and offers views of downtown’s skyline from the landings.
Photo © Benjamin Benschneider
![The building’s four upper levels have a heavy-timber structure of Douglas fir, with components such as laminated beams and wood-deck ceilings left largely exposed.](https://www.architecturalrecord.com/ext/resources/archives/news/2013/04/images/slideshow/130422/4.jpg?height=720&t=1450318324)
First Look: Miller Hull's Bullitt Center
The building’s four upper levels have a heavy-timber structure of Douglas fir, with components such as laminated beams and wood-deck ceilings left largely exposed.
Photo © Benjamin Benschneider
Post a comment to this article
Report Abusive Comment