Project Specs Art Gallery of Ontario Toronto, Canada Gehry International << Return to article the People Team Aaron Turner Adam Wheeler Anna Marie Flaherty Apurva Pande Cara Cragan Colby Mayes Craig Gilbert Dave Hardie David Pakshong Doug Glenn Doug Pierson Elizabeth Grace George Metzger Heather Waters Henry Brawner Jason Tax Jeff Guga John Passmore Julie Lai Karen Tom Laura Bachelder Laura Killam Lauren Taylor Leif Halverson Leon Cheng Lisa Cage Monica Valtierra Day Natalie Magarian Nathalie Kull Patrick Hwang Peter Buffington Randy Jefferson Rogan Ferguson Ronald A. Rosell Stephen Traeger Su Kim Susan Beningfield Zach Burns the Products Curtain
Project Specs Inujima Art Project Inujima, Japan Sambuichi Architects << Return to article the People Architect Sambuichi Architects 8-3-302 Nakajima-cho Naka-ku Hiroshima 730-0811 Japan T : +81(0)82 544-1417 F : +81(0)82 544-1418 samb@d2.dion.ne.jp Engineer(s): Arup Japan General contractor: Omoto Gumi Co.,Ltd the Products Structural system Art work: Yukinori Yanagi Plant advisor: Faculty of Environmental Science and Technology Okayama University Drainage: Faculty of Bioresource Sciences Akita Prefectural University, Kubota Hygiene: Sanyo Giken Ltd. Electricity: ASAHIDENGYO Co,.Ltd. Environmental observation / Chimney monitor system: Keisoku Research Consultant CO. Purify tank: Asahi Engineering Co,. Ltd. Stone works: NAKASEKI CO., LTD Wood made door
Three firms, Daoust Lestage, Williams Asselin Ackaoui, and Option Am'nagement, weave together multiple narratives to create Quebec's Promenade Samuel-de Champlain.
Travelers visiting Quebec City this summer who haven’t been there for some time, and who approach by car along the Saint Lawrence from the West, will find a stretch of the river’s waterfront completely transformed.
Project Specs Promenade Samuel-de Champlain Quebec, Canada Daoust Lestage, Williams Asselin Ackaoui, and Option Aménagement << Return to article the People Architect Le consortium DAOUST LESTAGE inc. – WILLIAMS ASSELIN ACKAOUI – OPTION AMÉNAGEMENT Personnel in architect's firm who should receive special credit Réal Lestage, urban planner – Project director Renée Daoust, architect, urban planner, partner Caroline Beaulieu, architect Lucie Bibeau, landscape architect Martin Adam, b. arch. Maria Benech, architect André Nadeau, landscape architect Simon Magnan, landscape architect Rachel Philippe-Auguste, architect Catherine St-Marseille, m.arch. Hubert Pelletier, industrial designer, m.arch. Nelson Couture, architect Jacques Michaud, senior technician Engineer(s): GENIVAR and SNC-Lavalin
Astudy in contrasts, French architect Marc Rolinet’s Chapel of the Deaconesses of Reuilly brings together all the classical functions of a church in two pure forms: a stark triangle of glass and, inside it, a rounded, egglike structure made of wood.
Project Specs The Chapel of the Deaconesses of Reuilly Versailles, France Marc Rolinet & Associes << Return to article the People Architect Rolinet et Associes 9 rue Pierre Villey 75007 Paris, France tel: +33 (0) 1 44 42 01 10 fax +33 (0) 1 44 42 01 20 Sylvain Vogt, architect Interior designer: Marc Rolinet Engineer Polkop General contractor: Polkop SARL France Photographer Daniel Moulinet tel: +33 6 13 21 67 68 Renderer Rolinet et associes CAD system, project management, or other software used: Autodesk The calculations necessary to achieve the coutours of the wood chappel were made with Robobat,
Passing through the Dung Gate on the south end of Jerusalem’s Old City walls, visitors walk down a Herodian street built 2,000 years ago and get a breathtaking view of an archaeological park overlooking the Temple Mount, the site of the Second Temple (destroyed in 70 A.D.) where the Dome of the Rock and Al-Aqsa mosques now stand.
Project Specs Rietberg Museum Expansion Zurich, Switzerland ARGE Grazioli Krischanitz << Return to article the People Architect ARGE Grazioli Krischanitz GmbH, Zürich (Alfred Grazioli and Adolf Krischanitz) Project architect: Elke Eichmann, Dipl. Arch. ETH SIA NDS Members of staff: competition: Wieka Muthesius, Birgit Frank, Ralf Wilkening construction planning: Thomas Künzle, Jay Thalmann, Dimitri Kaden, Naomi Hajnos, Simone Wiestner Interior designer: ARGE Grazioli Krischanitz GmbH, Zürich Engineer(s): Structural Engineer: Ernst Basler und Partner building services: Brunner Haustechnik building services electric: HEGE Elektro Glass-Planning (Pavillon): Ludwig und Weiler Consultant(s) Landscape: SIT Trüb Baumpflege, Aarau Lighting: d'lite lichtdesign, Zurich General contractor: Dietsche Walter,
Ano-nonsense brick structure built in 1910 to house Chinese laborers, the East Kong Yick Building lacked the kind of architectural features that provide excitement when an old building becomes a museum.