People Architect: Office of mcfarlane biggar 14b Chesterfield Place North Vancouver, BC V7M 3K3 Phone: (604) 986-9924 Fax: (604) 986-9932 Personnel in architect's firm who should receive special credit: Principal-in-Charge: Steve McFarlane Project Team: Steve McFarlane, Michelle Biggar, Josie Grant, Michael Green, Tomas Machnikoski, Daniel Marcotte, Lydia Robinson. Architect of record: Steve McFarlane Engineer(s): Structural: Equilibrium Consulting Inc. General contractor: Westcoast Turnkey + Somerset Homes Photographer(s): Jean Philippe Delage, office of mcfarlane biggar architects + designers (omb) CAD system, project management, or other software used: Autocad Lt, Sketchup |
Products Structural system Wood frame with minimal concrete foundation, steel posts, I-beams. Manufacturer of any structural components unique to this project: Protech Welding Ltd. Exterior cladding Metal Panels: Clear anodized aluminum by (Miracle Glass Works) Metal/Store front glazing : Miracle Glass Works Rainscreen: 3/4" Pressure treated 1x2 and 1x4 rainscreen with ribbed EPDM strip overlay. Wood: Clear cedar 1x4 custom milled on site per. Architects specifications. Supplied by Dicks Lumber and milled/installed by: West Coast Turn Key Moisture barrier: Typical 30min building paper (triple lapped) with some EPDM areas Other cladding unique to this project: Super panel concrete board by German Construction Systems Built-up roofing: Membrane roof Metal: Clear anodized aluminum by Miracle Glass Works Other: Wood Soffits: Vertical Grain Clear Western Red Cedar with 1/8in. shadow lines Supplied by BC Hardwood and installed by West Coast Turn Key Exterior Wood Decking: Camuru exotic hardwood decking supplied by Kayu Canada, installed by West Coast Turn Key. (all with hidden fasteners/ edge drilled angled trim head screws, specified screws supplied by Kayu Canada) Rain Water Leaders: Custom stainless steel 3in. piping with custom stainless steel brackets and through hall marine fittings for house penetrations. Custom metal work done by Burrard Mechanical and installed by West Coast Turn Key. Insulation: Icynene spray foam supplied and installed by Four seasons Insulation Windows Metal frame: Clear anodized thermally broken storefront aluminum frames by Miracle Glass Works Glazing Glass: No vertical mullions except at jambs. Glass temp 10mm temp / 10mm temp (solid glass no airspace) clear silicone joints. By Miracle Glass Works. Doors Entrances: In swing clear anodized commercial frame, complete with tempered glass sealed unit. Glass tempered by Miracle Glass Works. Wood doors: Interior 2in solid fir pivot doors supplied by Jim's Doors and installed by West Coast Turn Key Sliding doors: Interior 1-1/2in. solid fir pocket doors with full plywood frames and Soft open/close hardware supplied by Jim's Doors. Installed by West Coast Turn Key Exterior Sliding Doors: Commercial mall sliders OXX complete with tempered sealed unit. Glass tempered by Miracle Glass Works. Hardware Closers: Supplied by Latch's specialty hardware Pulls: Ikea Security devices: Motion sensor alarm from Home Depot Other special hardware: Push latch door hardware on mechanical and storage areas. Interior finishes Cabinetwork and custom woodwork: Ikea Cabinets installed by West Coast Turn Key Other by Fine Craft Cabinetry Paints and stains: Interior walls ' Behr Ultra Pure White Exterior cedar - Sikkens SRD Natural light All work done by: The Shore Decor Wall coverings: Wood Ceiling: Fir ceilings (Vertical Grain T&G Fir 4in wide with 1/8in. shadow line) installed in all upper floor ceilings and lower floor dropped living room/kitchen ceiling area. Supplied by BC Hardwood and Installed by West Coast Turn Key. (all other ceiling drywall with eggshell white paint) Solid surfacing: Drywall with 1/2in. anodized aluminum shadow lines installed at all floor and ceiling. Separating the drywall from fir flooring, fir ceiling, slate flooring and all built in cabinets and mill-work. Floor and wall tile: Pizzara Grey Cleft slate supplied by Stone Tile and installed by T&R Tile. installed in main entry and all mid floor level, stairs and up partition wall (supporting glass separation) between stair and entry (all grout lines inline) plus all bathrooms and up shower and tub walls in on-suite. Wood flooring: 6in wide select & better Vertical Grain old growth Douglas Fir engineered flooring with micro beveled edges. Finished with clear mono coat pure oil. Supplied by: BC Hardwood and Installed by: Capilano Hardwood Floors (in all areas other then mentioned tile floor areas) Special interior finishes unique to this project: Nicola Grey stone from Marble Art Lighting Interior ambient lighting: Lighting supplied by Lightolier and installed by NV Electrical Contracting Downlights: Lighting supplied by Lightolier and installed by NV Electrical Contracting Task lighting: Lighting supplied by Lightolier and installed by NV Electrical Contracting Exterior: Lighting supplied by Lightolier, Vistapro and Cascade lighting. Installed by NV Electrical Contracting Dimming System or other lighting controls: All supplied by Lightolier and installed by NV Electrical Contracting Plumbing Franke Kitchen Sink Paini Cox Kitchen Faucet Toto Eco UltraMax one piece toilets Duravit Architec corner washbasin Ikea Hollviken sink Paini Cox bathroom faucets Bette Form bath tub Energy Energy management or building automation system: Generator, Invertor system and battery pack with solar upgrade capability |